-
20 Pieces of Spiral Drill Collar are Awaiting Packaging and Shipment
20 pieces of spiral drill collar (OD 6 1/2'' x ID 2 13/16'', AISI 4145H, NC46 B) were ordered by our customer from southwest asia. We completed the production recently after about 50 d
2020-06-05 ord46505246 85
-
Seal kits & repair kits are finished and ready for ship
Seal kits & repair kits are finished and ready for shipRepair kits&seal kits ordered by middle eastern customers was completed this week and is now packed and ready for shipment. TIPTOP machin
2020-05-22 ord46505246 83
-
Tiptop High-Quality Vertical Downhole Drilling Mud Motor
Our esteemed European customer ordered three models of downhole motors this month. Now the mud motors are in production normally.Renowed for our reliability, responsiveness,flexibility and superior se
2020-04-15 ord46505246 124
-
Tiptop Casing Stabilizers are ready to ship!
Our valued Southeast Asian customer ordered a batch of Casing Stabilizer last month.Now the goods will be loaded after the inspection qualified.To make way for fresh stocks, we are able to offer some
2020-03-16 ord46505246 91
-
P235TC1 Curves are Shipped out of Shanghai Port
Our seamless carbon steel curves (diameter 31.8mm, WT 3.2mm, 180°, Efect R37.5, P235TC1 (ST35.8)) were ordered by an European customer at the end of last year. After 18 days of intensive production, w
2020-03-12 ord46505246 165
-
Third party inspection of coiled tubing made of 2205 duplex stainless steel
The production of the coiled tubing ordered by a new customer was completed on schedule, and we accompanied the third-party inspector designated by the customer to complete the inspection before deliv
2020-01-19 ord46505246 335
-
Tiptop crank mechanism is ready to ship!
Our European customer has ordered four sets of crank mechanism's QF-1300 spare parts,now are ready to ship. Please kindly noted that we now have the goods in stock and shipment can be arranged imm
2020-01-14 ord46505246 86
-
316L Control line delivery news
This week we have our 3/8'' 316L control lines inspected and delivered.
2019-12-06 ord46505246 103